Solar installer in Camp Hill, PA

Solar Grids Central PA is a solar installation service for Camp Hill-area homeowners deciding how to pay. It would price one system design as cash, a loan, a lease and a power-purchase agreement on the same rows, with your PPL bill credit and contract terms shown, before you sign anything.

  • For Camp Hill homeowners deciding how to pay
  • Cash, loan, lease and PPA on one sheet
  • See every fee before you sign anything

Get your free quote Run the four-way check

A two-storey house with weathered white shingle siding and a dark solar array across its roof, an American flag by the hedge, under a clear blue sky.
One Camp Hill design, priced four ways Illustrative calculation: 8.26 kW DC at EcoGen's $2.87/W Pennsylvania benchmark, with example loan, lease and PPA terms. Not offers.
CashLoanLeasePPA
Who owns the panelsYouYouThe leasing companyThe PPA company
How you payPaid up frontAbout $209 a month$150 a month, rising 1.9% a year13¢ per kWh, no escalator
Paid over 25 years$23,706$62,773$56,924$35,388

Change the numbers in the four-way check

  • 5.0 from 11 reviews
  • Camp Hill, PA
  • (717) 966-6286

Camp Hill, Pennsylvania

Cash, loan, lease or PPA on the same page

Solar Grids installs across Camp Hill and the Harrisburg west shore, where the financing comparison usually decides the deal. One design is priced as cash, a loan, a lease and a power-purchase agreement on identical rows.

What customers say

Solar GridsSolar design and installation · Camp Hill, PA

Serving Camp Hill and nearby towns

★★★★★5.0 from 11 Google reviews

What we do

What we do

  1. Financing comparisonCash, loan, lease and PPA on the same design and the same rows.
  2. Rooftop solarPanels and layout sized from your usage and priced per DC watt.
  3. Ground mountsRacks for the larger lots west of the river.
  4. Utility interconnectionThe utility application and the permission to operate.

Call or visit

Talk to us

Phone(717) 966-6286Call to book an assessment.
Office1521 Cedar Cliff Dr #101, Camp Hill, PA 17011Parking on site.
EstimatesFree, in writingDesign and price as separate documents.

Get your free quote

Why homeowners pick us

Why homeowners pick us

  • The fee, not just the rateDealer fees and escalators are shown as their own lines.
  • Twenty-year viewTotal cost over the term, not the monthly figure alone.
  • Free written estimateA design and a price before you commit to anything.

Our story

Our story

  1. Installing across Camp Hill, Mechanicsburg, Lemoyne and the west shore.

From the kitchen table to switch-on

The proposed service, in the order you would see it. Nothing is signed and no credit is checked until step three.

  1. Home visit

    One frozen design: roof faces, shade, kW DC and a yearly kWh estimate. No credit check.

  2. The four-column sheet

    Cash, loan, lease and PPA priced on that design, on the same rows, to take home.

  3. You choose and sign

    Three business days to cancel an installation contract, wherever you signed.

  4. Permit and PPL

    Borough plan review up to 15 days; PPL's Level 1 review runs in parallel.

  5. Permission to operate

    Inspection, PPL's sign-off, then SREC registration by whoever owns the system.

Four ways to pay for the same roof

Each kind of solar offer leads with a different number. A loan offer shows a monthly payment. A PPA offer shows a rate per kWh. Some installer pages still promise the 30% tax credit. None of those numbers can be set against the others, so the first job is to put every option on the same footing.

Start with what separates them: who owns the panels, and who keeps what they earn.

Question Cash Loan Lease PPA
Who owns the system You You (the lender may file a lien) The leasing company The PPA company
What you pay The full price up front A monthly loan payment A fixed monthly rent A rate per kWh produced
Who keeps the SRECs You You Usually the company Usually the company
Who handles repairs You, under the warranties You, under the warranties Usually the company; check the contract Usually the company; check the contract
If you move The system stays with the house Pay off the loan or deal with the lien Transfer or buyout, per the contract Transfer or buyout, per the contract

A PPA (power-purchase agreement) means a company owns panels on your roof and sells you the power they make. A lease is similar, but you pay a set monthly amount instead of a rate per kWh. Neither makes you the owner. Treasury's advisory on what to check before signing a PPA warns that you will not automatically own the system when the contract ends. An offer that says "you always own your system" and also lists a lease is describing two different deals.

SRECs (solar renewable energy credits) are certificates a system earns for each 1,000 kWh it produces. In Pennsylvania they are registered and can be sold, and whoever owns the system usually keeps them.

The federal tax credit no longer tips this choice. The IRS states that the Residential Clean Energy Credit is not available for property placed in service after December 31, 2025. A 2026 cash or loan quote that subtracts 30% is counting money you will not get. Lease and PPA companies may claim a separate business credit (section 48E, according to EcoGen). You do not.

Some companies also sell lease variants, such as a prepaid lease. If one is offered, ask for it on the same rows as everything else.

What would be checked, and what you bring

We start with one home visit: no credit check, no contract. It would take about two hours (Illustrative example; no visit length is set yet).

Bring these:

  1. Twelve months of electric bills. Camp Hill homes are served by PPL Electric Utilities. The bills show your monthly use and your rate schedule, usually RS (regular residential service).
  2. Your generation supplier's name. It is printed on the bill. If it is a company other than PPL, your solar surplus may be credited differently (see the PPL section below).
  3. Your roof's age, plus any roofing invoice or warranty.
  4. Your main electrical panel's size, printed on the main breaker.

The visit would settle three things:

  • One frozen design. Roof faces, shade, system size in kW DC (the panels' rated output), panel and inverter models, and a yearly kWh estimate. Every way to pay is priced on this same design, so the only differences left are the money terms.
  • Roof and panel work. EcoGen's Pennsylvania guidance is to replace a roof with less than 10 to 15 years left before panels go up. A re-roof or a panel upgrade becomes its own priced line, never folded into the solar price.
  • Your finance questions. How long you expect to stay in the house, how much cash you could put in, whether a loan payment would be comfortable, and whether you want to own the SRECs. Your tax position no longer matters for an owned system, because the residential credit has ended.

What you'd get in writing before you decide

We hand over three documents before you sign or agree to a credit check :

  • A four-column comparison sheet. Cash, loan, lease and PPA, each priced on the frozen design. Rows: upfront cost, month-one payment, yearly increase, term, total paid over the term, the financing fee in dollars, the cash-equivalent price per watt, who owns the system, who keeps the SRECs, who claims any federal credit, the bill-credit assumption for your supplier, the production guarantee, panel removal for a re-roof, what happens if you sell the house, and the cancellation window.
  • A 25-year cash flow for each option, with the loan rate, escalator and production assumptions written on it, so you can test them.
  • A responsibility sheet naming who handles the borough permit, the structural engineer's letter, the borough inspection, the PPL interconnection and net-metering application, and SREC registration.

Battery, panel upgrade and re-roof would be optional lines, priced separately so they cannot hide inside a per-watt price.

The point of the paperwork is that you can take it home. If a figure on the sheet cannot be traced to the design or a stated assumption, it does not belong there.

One Camp Hill design priced four ways

This is what the comparison sheet would look like for one house. The design is EcoGen's typical Pennsylvania system: 8.26 kW DC, about 11,556 kWh in year one, and about 272,000 kWh over 25 years at EcoGen's assumed 0.5% yearly output loss.

The loan rate, dealer fee, lease payment, PPA rate and escalators below are example figures, not offers.

Row (Illustrative calculation) Cash Loan Lease PPA
Upfront $23,706 $0 $0 $0
Price basis $2.87/W (State benchmark) Principal $29,632 with a 20% dealer fee $150 a month 13¢ per kWh
Financing fee in dollars None $5,926 Ask Ask
Yearly increase None Fixed rate, 6.99% 1.9% escalator No escalator
Month-one payment None About $209 $150 About $125
Total paid over 25 years $23,706 About $62,773 About $56,924 About $35,388
SRECs, about $327 a year (volatile) Yours Yours Usually the company's Usually the company's
PPL bill credit (default supply) Full retail netting Same Same Same
Federal credit None None Company may claim 48E Same

A dealer fee is a lender charge built into the loan amount, stated as a share of the principal. EcoGen reports 15% to 30% of principal on Pennsylvania solar loans. An escalator is the yearly increase in a lease or PPA payment; EcoGen reports 1.9% to 2.9%.

Illustrative calculation. With a 20% dealer fee as a share of principal, the loan principal is $23,706 ÷ 0.80 = $29,632, or $3.59 per watt. At 6.99% over 25 years that is about $209 a month and $62,773 in total. Without the fee, the same loan totals about $50,219. The $150 lease rises 1.9% a year to about $236 a month by year 25, for $56,924 in total; at 2.9% it reaches $64,772. The PPA at a flat 13¢ on about 272,000 kWh comes to $35,388; with a 2.9% escalator it would be about $50,560.

How to read it:

  • Compare total paid, not the monthly payment. The PPA's $125 and the loan's $209 look close in a monthly budget. Over 25 years the loan pays out about $27,000 more, though it also buys you the system and its SRECs.
  • Total paid is not a price. Lease and PPA payments usually cover repairs, and the company keeps the SRECs. With cash or a loan, set aside money for upkeep and count your SREC income.
  • The bill credit is the same in every column. You are the PPL customer either way. EcoGen models this design's year-one bill value at about $2,113 in PPL territory, at an all-in rate of 18.286¢ per kWh. Under a lease or PPA, your payment comes out of that.

Year one, after payments

Here is the same design in year one, with the bill value set against what each option costs that year.

Year one (Illustrative calculation) Cash Loan Lease PPA
Bill value (EcoGen PPL model) $2,113 $2,113 $2,113 $2,113
Payments that year None ($23,706 paid up front) About $2,511 $1,800 About $1,502
SREC income (volatile) About $327 About $327 Company's Company's
Left over in year one About $2,440 About −$71 About $313 About $611

These figures assume PPL default supply and leave out upkeep. The loan shows the trade most clearly: year one runs slightly negative, and the payoff comes from owning the system once the loan ends. A lease or PPA starts ahead in year one, and the escalator decides how long it stays ahead.

Which column usually fits which household

The comparison only helps if you know what you are optimizing for. Four common situations:

  • You have the cash and plan to stay. Cash has the lowest 25-year total in the example. The Department of Energy's homeowner guide makes the same general point: a purchased system can be installed at a lower total cost than one financed with a loan, lease or PPA. You also keep the SRECs and pay for upkeep.
  • You want to own but not pay up front. A loan, and the number that decides it is the dealer fee. In the example, the fee alone adds about $12,500 to the 25-year total ($62,773 against $50,219). Ask for a no-fee rate, and compare lenders.
  • You don't want to own or maintain equipment. A lease or PPA. Here the escalator decides the deal: at a flat 13¢ the PPA totals about $35,388, but at 2.9% a year it reaches about $50,560, roughly the no-fee loan's total, and you still own nothing at the end.
  • You might sell within a few years. Read the "if you move" row before anything else. A loan lien, or a lease a buyer must take over, becomes part of your sale.

What moves the price: the $/W check

To check a cash quote or a loan amount, turn it into price per watt: divide the dollars by the system size in watts DC. An 8.26 kW system is 8,260 W.

Compare the result with EcoGen's Pennsylvania solar cost benchmark: $2.87 per watt (State benchmark, modeled installed price before incentives, EcoGen Solar Cost Index, September 2026 Edition, prices as of September 25, 2026). EcoGen's quote band for the state runs from $2.56 to $3.16 per watt. It is a state benchmark, not a quote for your home.

Before you divide, take out anything that is not solar:

  • a battery
  • a re-roof, or removing and reinstalling panels for one (EcoGen: $2,000 to $6,000 for an existing array)
  • a main panel upgrade (EcoGen: $2,000 to $4,000)

Illustrative calculation. A quote lists an 8.26 kW system at $27,500 cash, with no battery or roof work. $27,500 ÷ 8,260 W = $3.33 per watt, above the $2.87 benchmark and the $2.56 to $3.16 band. A loan for the same system with a 20% dealer fee has a principal of $27,500 ÷ 0.80 = $34,375, or $4.16 per watt. Compare that number, not the monthly payment.

A result above the band is a question, not a verdict. Ask the installer what the extra $0.46 per watt pays for: premium panels, a hard roof or extra electrical work.

The loan is where this check matters most, because a dealer fee shows up as a principal higher than the cash price. Treasury's advisory on buying solar panels tells buyers to ask whether a lender fee is in the loan, how much it is and what it is for, and to shop other lenders.

For a lease or PPA, $/W does not apply because you are not buying anything. Use the 25-year total paid, with the escalator stated.

One optional add-on, priced separately: PPL's Optimized Battery program pays $150 per kW per season, up to $800 a year, for enrolled Enphase or SolarEdge batteries (per EcoGen, checked October 1, 2026).

What PPL credits, and why your supplier matters

PAPowerSwitch, the Pennsylvania Public Utility Commission's rate site, lists PPL as the only distribution utility for ZIP 17011. For a Camp Hill address, PPL connects the system and handles the bill credit.

Pennsylvania's net metering rule, 52 Pa. Code §75.13, works like this:

  • During the year, each kWh you export is credited at the full retail rate, including generation, transmission and distribution charges, up to what you used in that billing period.
  • Leftover kWh roll forward. At the end of the compliance year (June 1 to May 31), any surplus is paid at the price to compare.
  • The price to compare is the default supply price that shopping offers are measured against. For PPL's regular residential service it was 13.079¢ per kWh, updated November 2, 2026, and in effect through November 30, 2026. It resets December 1, so check the current figure.

The practical rule: size the system to your yearly use. Surplus beyond that earns the price to compare, well below the 18.286¢ all-in rate EcoGen uses for PPL.

If your bill names a competitive supplier

On PPL's default service, the full-retail rule above applies as written. If your bill names a competitive supplier (an EGS, or electric generation supplier), PPL credits only its own distribution charge. What the generation part of your exports is worth depends on your supplier contract; the rule says it must be stated in the service agreement.

That can shrink the savings under all four options at once, because the bill credit is the same row in every column. Ask the supplier, in writing, how they credit exported solar kWh. If they cannot answer, treat any full-retail savings figure as unproven.

The comparison sheet would carry a bill-credit row naming your supplier, so the savings column rests on your actual contract.

Camp Hill permit: plans, engineer, inspection

According to Camp Hill Borough's solar energy page (read from a November 2025 copy; the live page blocked automated reading on November 18, 2026):

  • A rooftop system needs a building permit with two sets of plans and documentation from a licensed structural engineer that the roof can carry the added load.
  • The borough uses a third-party agency for plan review and inspections.
  • The permit fee is paid up front, based on estimated project cost. Third-party fees are due at pickup, roughly $350 for residential solar.
  • Plan review takes up to 15 days.
  • A zoning permit is typically not needed for roof-mounted panels on a single-family detached home, unless review raises a zoning concern.

Confirm the current fee and timing with the borough before you budget around them. The structural letter matters for your comparison too: whoever orders it should be named on the responsibility sheet, and its cost should sit on a line you can see.

The same page notes that the borough's Climate Action Plan aims for solar on 20% of residential households by 2030, and that Pennsylvania has no solar-access or solar-rights law, including for homeowners associations. If you have an HOA, its rules still apply.

The utility and permit route change by address across this part of Cumberland and Dauphin counties. In New Cumberland, some addresses are on Met-Ed rather than PPL, and any accessory solar needs zoning approval. Mechanicsburg has the same utility split plus a historic review board. Harrisburg runs its own codes bureau with a separate electrical permit. Steelton takes permit applications in person. The service itself is a proposal, and coverage of every town, Camp Hill included, is not yet confirmed.

From signature to permission to operate

The borough inspection and PPL's approval are separate steps. Some guides merge them into "the town inspects and approves interconnection." The town does not approve your grid connection; PPL does, and the borough's sign-off is one of the conditions PPL needs. Here is the order, with Level 1 timelines from 52 Pa. Code §75.37:

  1. Contract signed. For the installation contract, the three-business-day cancellation window starts.
  2. Borough permit application with plans and the structural letter. Review takes up to 15 days.
  3. PPL interconnection application. Certified inverter-based systems of 10 kW or less, like the 8.26 kW example, get Level 1 review; larger home systems go to a higher level. Under Level 1, PPL has 10 business days to say whether the application is complete, then 15 business days to run its screens.
  4. Installation.
  5. Borough inspection by the third-party agency.
  6. Certificate of completion sent to PPL.
  7. Witness test or waiver. PPL may test the system within 10 business days after receiving the certificate. If it does not, the test is waived.
  8. Interconnection agreement. You sign PPL's standard agreement. If you do not sign within 30 business days of receiving it, the request is treated as withdrawn unless you ask for more time.
  9. Permission to operate. Once local code approval, the certificate, the witness test or waiver and the signed agreement are all in place, PPL approves the connection and you can switch the system on.
  10. SREC registration. The owner registers the system through PennAEPS and then PJM-GATS.

Ask each installer which steps they handle and which land on you. An unregistered system earns no SRECs. Under a lease or PPA, registration usually falls to the company, since it usually keeps them.

After switch-on: monitoring, repairs and warranty questions

Aftercare differs most between owning and not owning, so settle it in writing before you choose a column:

  • Workmanship warranty, separate from the panel and inverter warranties. EcoGen suggests looking for 10 years or more on workmanship.
  • Monitoring. Who watches production, and who gets the alert when it drops.
  • Production guarantee in a lease or PPA, and how a shortfall is paid back.
  • Repairs. Who fixes the system, how fast, and whether lease or PPA payments stop while it is down.
  • Re-roofing and storms. Who removes and reinstalls the panels and pays for it, and whose insurance covers storm damage.
  • If the company is sold. What happens to your lease, PPA or warranty when another company takes it over.

If you might sell the house, ask how a loan lien or a lease affects the sale. Treasury notes that a UCC-1 filing (a public notice of a lender's or owner's claim on the equipment) can affect whether a buyer wants the home.

Questions to ask any Camp Hill solar installer before you sign

Pennsylvania's Home Improvement Consumer Protection Act (HICPA) names solar energy systems as home improvements. Contractors doing $5,000 or more a year of that work must register with the state Attorney General and put the registration number on contracts, estimates and proposals.

A home improvement contract is not valid unless it is written and includes:

  • the contractor's HICPA registration number
  • the date, and the contractor's name, address and phone number
  • approximate start and completion dates
  • a description of the work and equipment specifications
  • the total price and any down payment
  • subcontractors known at signing
  • the contractor's insurance amounts
  • a notice of your right to cancel

You can cancel within three business days of signing, wherever you signed. The contractor cannot ask for payment before you sign. On a contract over $5,000, the deposit is capped at one-third of the price, plus special-order materials.

Then add the money questions:

  1. Is there a dealer or lender fee in the loan? How much in dollars, and what is it for?
  2. Is the loan secured, and will anyone file a lien or UCC-1? Is there a prepayment penalty?
  3. What is the escalator, and what is the payment in year 25?
  4. What does it cost to exit early or buy out the system?
  5. What happens to the contract if the company is sold?
  6. Who keeps the SRECs, and who registers them?
  7. Which supplier does the savings estimate assume? It should name yours.
  8. Is the federal residential credit in this quote? If so, ask for it to be removed.
  9. Does the cancellation right cover this lease or PPA? HICPA's text does not settle whether a solar lease or PPA counts as a home improvement contract. Treasury's PPA advisory says you should have at least three days to cancel. Get the cancellation terms in writing either way.

The quote checklist on this site collects these questions for any installer's offer.

Short answers

Can I still get the 30% solar tax credit? Not for a system you own placed in service after December 31, 2025, according to the IRS. Under a PPA, Treasury's advisory calls the claim that tax credits cut your cost a lie.

Is a lease or PPA "free solar"? No. You pay monthly or per kWh. In the example above, 25-year totals run from about $35,000 to $65,000, depending on the deal and the escalator.

How much are solar panels in Pennsylvania? EcoGen's September 2026 state benchmark is $2.87 per watt before incentives, about $23,706 for a typical 8.26 kW system.

Who is the best company to buy solar from? No ranking answers that for your roof. A better test: which company fills in every row of the comparison sheet, in writing, for the same design, before asking you to sign or run your credit.

Four-way check

Type in the numbers from the quotes you have, or keep the worked example. The check puts cash, loan, lease and PPA on one sheet: what you pay up front, each month and in total, and what the cash and loan prices work out to per watt. It runs on this device; nothing is sent or stored.

The design
Cash
Loan
Lease
PPA

CashLoanLeasePPA

Illustrative calculation. Production falls 0.5% a year (EcoGen's assumption). Loan payments use the standard amortization formula. Totals are payments only: they leave out SREC income, the bill credit, upkeep and any buyout. Total paid is not a price: lease and PPA payments usually include repairs, and owners keep the SRECs. Benchmark: EcoGen Solar Cost Index, Pennsylvania, September 2026 Edition.

Four nearby town guides

The four ways to pay stay the same across the river and the valley. What changes is the utility on the bill and the office that signs off the permit. Coverage outside Camp Hill is proposed and not confirmed.

Get your free quote

Pick your town and how you are thinking of paying. The site builds the checklist to bring to any installer's visit, with your town's local rule at the top. It runs on this device: nothing is sent or stored.